Sign In | Join Free | My adobecards.com
China Zhangjiagang HuaDong Boiler Co., Ltd. logo
Zhangjiagang HuaDong Boiler Co., Ltd.
Zhangjiagang HuaDong Boiler Co., Ltd.
Verified Supplier

8 Years

Home > Thermal Oil Boiler >

Enameled Seam Carbon Steel Boiler Combustion Air Preheater For Power Station

Zhangjiagang HuaDong Boiler Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

Enameled Seam Carbon Steel Boiler Combustion Air Preheater For Power Station

Brand Name : HD BOILER

Model Number : APH

Certification : ISO9001,ASME,Grade A,SGS,EN

Place of Origin : China

MOQ : 1 Set / Sets 10tons

Price : Negotiable

Payment Terms : L/C, T/T, Western Union, MoneyGram

Supply Ability : 500 Tons per Month

Delivery Time : 30 Days

Packaging Details : Seaworthy Packing

Condition : New

Structure : Fire / Water Tube

Fuel : Coal/Gas/Coal-fired/Water heat

Style : Horizontal and Vertical

Manufacturing Level : A

Surface Treatment : Painted

HS Code : 3215960855

Range of Applications : Industrial / Power Station

Contact Now

ASME Certification Energy Saving Boiler Parts Air Preheater For Power Plant Boiler

Description


The air preheater is a heat exchanger that uses the flue gas heat from the rear of the boiler to heat the air needed for combustion.The tube and tube plate can be sealed with heat resistant packing, and can be sealed by welding.Customers can choose according to their own needs.

Types
There are two types of air preheaters for use in steam generators in thermal power stations: One is a tubular type built into the boiler flue gas ducting, and the other is a regenerative air preheater.These may be arranged so the gas flows horizontally or vertically across the axis of rotation.
Material
Carbon steel or equivalent
Stucture
Vertical
Tubes
Enameled seam or seamless tubes
Tube OD
Customized
Enamel thickness
0.34+/-0.06mm
Size
Customzied design
Brand
HDB
Remarks
Customized order is also accepted.
Manufacturing process
Material→Ingot → Hot/Cold-Rolling→ Heat treatment(Normalizing+ tempering) → Inspection→Cutting→Pipe piercing→welding→Sealing
test→Painting→Packaging

1. A device,which increases the tempurature of air before it supply to the furnance using heat from flue gases passing through chimney.

2. The heat carried with the flue gases coming out of economiser is further utilised for preheating the air before supplying to the combustion chamber.

3. An increase of 20 degree centigrade in the air temp.increases the boiler efficiency by1%.

4. It is a necessary equipment to supply hot air for drying the coal in pulverised fuel systems to facilitate grinding and satisfactory combustion of fuel in the furnace.

Benefits


1. Improved combustion rate and then increases steam generations rate of boiler.

2. Due to higher temperature of air, furnance temperature increases, so low grade coal can be burnt efficiently.

3. Air heated by heat of exhaust gases.It reduces fuel consumptions.Therfore thermal efficiency of boiler increased.

4. Saving in fuel consumption and Increased steam generation capacity.

Tubular air preheater


Our factory specialise in tubular air preheaters.Tubular air preheaters may have a number of configurations.

1. A bundle of vertical tubes through which the flue gas flows downward and exchanges heat with ambient air flowing horizontally across the exterior of the tubes. Baffles are usually provided so that the air flows across the tubes a number of times. For example, as shown in the adjacent diagram, the air flow across the tubes three times and is referred to as 3-pass tubular air preheater.
2. The same as (1) above except that the flue gas flows upward rather than downward.
3. A bundle of horizontal tubes through which the air flows and exchanges heat with the hot flue gas flowing downward across the tube bundle.

Adavantages


1. Preheated air increases combustion rate and then increases steam generations of boiler.

2. Due to higher temp. of air,furnace temp.increases,so low grade coal can be burnt efficiently.

3. Air heated by heat of exhaust gases.It reduces fuel consumptions.Therefore thermal efficiency of boiler increased.

Construction


An air preheater is installed between economisers and the chimney.It consists of large numberss tubes which arranged in the path flue gases shell.Inlet air is at lower end.Baffles are provided inside air preheater.The soot hopper is provided at the bottom.

Working process


1. Hot flue gases enters into tubes from the top of the shell and leaves from to the chinmney.

2. The inlet air at R.Tem. is admitted into the shell with the help of the fan.

3. The air passes upward around the tubes in the opposite direction to the flow of the hot gases.

4. Baffeles increases the total path length of air thus increase heat transfer.

Enameled Seam Carbon Steel Boiler Combustion Air Preheater For Power Station

Testing

Enameled Seam Carbon Steel Boiler Combustion Air Preheater For Power Station


Product Tags:

Enameled seam Combustion Air Preheater

      

Carbon steel Combustion Air Preheater

      

Enameled seam boiler preheater

      
 Enameled Seam Carbon Steel Boiler Combustion Air Preheater For Power Station Manufactures

Enameled Seam Carbon Steel Boiler Combustion Air Preheater For Power Station Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhangjiagang HuaDong Boiler Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)