Sign In | Join Free | My adobecards.com
China Zhangjiagang HuaDong Boiler Co., Ltd. logo
Zhangjiagang HuaDong Boiler Co., Ltd.
Zhangjiagang HuaDong Boiler Co., Ltd.
Verified Supplier

8 Years

Home > Boiler Economizer >

SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation

Zhangjiagang HuaDong Boiler Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment

SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation

Brand Name : HDB

Model Number : Boiler Economizer

Certification : ASME, EN, ISO9001, SGS

Place of Origin : China

MOQ : 1 set

Price : Negotiable

Payment Terms : L/C, T/T, Western Union

Supply Ability : 500 tons per month

Delivery Time : 60~150 days

Packaging Details : Seaworthy packing

Porduct Name : Boiler Economizer Banks

Application : Coal-fired Boilers and Waster Incinerator

Material : SA210A1

Keyword : Boiler Economizer

Production Technique : Hot Bending, Extrusion

Loading Port : Shanghai, China

Contact Now

SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation

Product Introdution

Boiler low pressure economizer, also known as low temperature economizer or flue gas waste heat utilization: including economizer tube screen, heat exchange tube bundle, inlet box, outlet box, which is characterized by the inlet box through the pipe and low pressure heat return system heater connection, outlet box through the pipe connection deaerator, low pressure economizer installed in the boiler air preheater outlet tail flue.

The low pressure economizer is installed on the tail flue of the outlet of the boiler air preheater and is composed of a tube bundle, an inlet coupler and an outlet coupler. The tube bundle adopts finned modified tube structure, and the tube base tube and the surface of the fin are modified. The condensate water in the system is heated by the low pressure return heat, and the high temperature and low temperature can be switched, and the water is introduced into the deaerator. Reduce the boiler exhaust temperature and improve the circulating heat efficiency of power plant.

Competitive Advantage

1.Fuel saving: After the high temperature fuel gas released by fuel combustion transfers to the boiler water wall tubing, superheater, and reheater, the temperature is extremely high, the economizer makes it ideal for preventing heat loss. The economizer located at the flue of the boiler reduces the flue gas temperature, and maximizes the heat recovery to lower customer fuel costs.

2.Improvement of boiler steam drum working conditions: When entering the steam drum, the temperature of the feed water is increased after it has been heated using the economizer. The thermal stress caused by the temperature difference between the steam drum wall and the feed water is reduced, thus reducing the shrink and swell of the steam drum, and extends the service life.

3.Cost reduction of coal fired boilers: Water is being heated in the boiler economizer made using low temperature material. This makes the economizer a less costly replacement for high temperature boiler water wall tubing, and reduces overall boiler manufacturing costs.

Parameters of Boiler Economizer

Description Boiler economizer
Material SA210A1 and SA240-309S
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames

SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation

Working Process of Boiler Economizer

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).


Product Tags:

Boiler Economizer With Manifolds Header Covered

      

Boiler Economizer With Thermal Insulation

      

Coal fired Extrusion Boiler Economizer

      
 SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation Manufactures

SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhangjiagang HuaDong Boiler Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)